DCIM100MEDIADJI_0016.JPG

    Bursa Valilik Binası

    Applied Products

    About Project

    Recep Tayyip Erdogan Imam Hatip High School whose construction was completed in Istanbul.

    6000 m2  Active Beige marble has been used for  flooring, step, skirting and outdoor column coverings and 2.000 m2 Maroon Marinace marble has been used in column covering and floors.

    150 m2 Equator Marmara is preferred for ablution hall and elevator coverings.