Applied Products
About Project
Recep Tayyip Erdogan Imam Hatip High School whose construction was completed in Istanbul.
6000 m2 Active Beige marble has been used for flooring, step, skirting and outdoor column coverings and 2.000 m2 Maroon Marinace marble has been used in column covering and floors.
150 m2 Equator Marmara is preferred for ablution hall and elevator coverings.